We're sorry but this page doesn't work properly without JavaScript enabled. Please enable it to continue.
Feedback

Application of FOSS4G for improving the environmental impact assessment process

Formale Metadaten

Titel
Application of FOSS4G for improving the environmental impact assessment process
Serientitel
Anzahl der Teile
266
Autor
Lizenz
CC-Namensnennung 3.0 Deutschland:
Sie dürfen das Werk bzw. den Inhalt zu jedem legalen Zweck nutzen, verändern und in unveränderter oder veränderter Form vervielfältigen, verbreiten und öffentlich zugänglich machen, sofern Sie den Namen des Autors/Rechteinhabers in der von ihm festgelegten Weise nennen.
Identifikatoren
Herausgeber
Erscheinungsjahr
Sprache

Inhaltliche Metadaten

Fachgebiet
Genre
Abstract
Because environmental impact assessment(EIA) process is a combination of detailed fields that require a lot of expertise (e.g., noise, air pollution, odor, water pollution, ecological environment, living environment, etc.), despite its long history, the process is still complex and slow, and it is not easy to break away from the document/drawing-centered work process. Since the nature of the environment involves many geographic/spatial context, if it can be assisted with a spatio-temporal system, it can be expected to show very high efficiency compared to the current process. To verify the feasibility of such a system, we adopted a FOSS4G-based approach and developed a pilot system in this study. Specifically, we used GeoServer and Postgresql/PostGIS for handling and providing data spatially, and Cesium for 3D geospatial based visualization. We focused on the design and implementation of APIs to assemble the sub-processes of EIA, as well as the visualization and UI of the pilot system. This system demonstrates how the noise propagate during and after the construction in an interactive way. We expect the system will increase the non-expert stakeholder's understanding of noise propagation visually. Through this presentation, we will discuss our findings implemented in a EIA process centered on the noise, from the first step of applying for approval from the civil/construction operator to the last step of deriving the final evaluation opinion by the noise expert in charge, and provide clues to the future of Digital EIA.